SOM · National Team

Somalia ☆

Statistics
Team strength · Elo all ratings ›
Rating 1,326 everyone starts at 1500
Peak 1,500 reached 11 Nov 1963
Rank #296 of 336 national teams
Matches rated 124 last 26 Nov 2025

What this team's results have earned: every match in the database is replayed in date order, both sides start at 1500 and the winner takes points from the loser. The rating is the one it held after its last rated match, and the rank counts every national team ever rated, sides that no longer play included. A measure of strength, not a forecast of the next result. Computed 3 Nov 2026.

Longest no-draw runs all on the records page ›
By competition (all-time)
CompetitionPDDraw%
CECAFA Cup 71 7 9.9%
FIFA World Cup qualification 23 4 17.4%
Friendly 14 1 7.1%
African Cup of Nations qualification 11 2 18.2%
Arab Cup qualification 5 1 20.0%
By calendar year
YearPDDraw%Max
2026 4 2 50.0% 2
2025 8 2 25.0% 5
2024 4 1 25.0% 2
2023 4 0 0.0% 4
2022 2 0 0.0% 2
2021 2 0 0.0% 2
2019 2 0 0.0% 2
2015 5 0 0.0% 5
2013 3 0 0.0% 3
2012 3 0 0.0% 3
2011 5 1 20.0% 4
2010 3 0 0.0% 3
2009 6 0 0.0% 4
2008 1 0 0.0% 1
2007 4 0 0.0% 4
2006 6 0 0.0% 6
2005 4 0 0.0% 4
2004 3 0 0.0% 3
2003 2 0 0.0% 2
2002 4 0 0.0% 4
2001 3 1 33.3% 2
2000 5 1 20.0% 2
1999 2 0 0.0% 2
1995 2 0 0.0% 2
1994 3 0 0.0% 3
1986 3 1 33.3% 2
1984 5 1 20.0% 4
1983 3 1 33.3% 2
1982 1 0 0.0% 1
1980 4 3 75.0% 1
1978 4 1 25.0% 3
1977 1 0 0.0% 1
1976 4 1 25.0% 3
1974 6 1 16.7% 5
1973 3 0 0.0% 3
1972 1 0 0.0% 1
1969 2 0 0.0% 2
1963 1 0 0.0% 1

Over 128 matches (Nov 1963 – Sep 2026), Somalia drew 15 where the draw model expected 26.5 from those particular fixtures — about 11 fewer, or 2.5 standard errors, more of a gap than most, though roughly one subject in twenty looks like this by chance.

As unusual as a coin landing the same way 7 times running. A flat league average would have expected 30.0 instead — "more draws than the league" and "more draws than these fixtures deserved" are different claims. 4 of the matches carry no model probability and are left out. These matches were part of the model's own training set, so its chances were fitted already knowing the results.